Satellite Station
Start-up of new installation
Start-up of Satellite station
-
Flush pipes before satellite is connected to remove impurities
-
Install satellite and connect water and air
-
Check connections to satellite
-
Water supply (pipe size, union, ball valve)
-
Air supply (pipe size, union, ball valve)
-
-
Set air pressure to approx. 5 bar
-
Set function selector in Rinse mode
-
Slowly open inlet ball valve to fill pipes with water (open satellites outlets to flush pipes)
-
Set chemical dosing
-
Check all functions (Rinse, foam and disinfection)